Share
We have lost – ROBIN

We have lost – ROBIN

“The Amaila Falls Hydropower Project would have been pushing 168 additional megawatts into the Guyana grid at no cost to the taxpayers; consumers would have seen the cost of electricity drop by over 30 per cent on monthly bills. Instead, we have lost 17-plus megawatts since 2015, the first time since the 1980s that we have not increased or maintained power output.”

ROBIN SINGH

Leave a Comment